抄録
It is necessary for keeping high productivity to adjust demands with changes of production capacity in the Demand Synchronized Production system. This paper includes a considering of the way to loading to the system according actual orders. Firstly, a conceptual relation about equipments of the Demand Synchronized Production system is assumed. Secondly, two workload leveling that Kuring and Rolling are named are compared. Finally, the usage of these leveling methods is summarized.