生産システム部門講演会講演論文集
Online ISSN : 2424-3108
セッションID: 3301
会議情報
3301 工程付加価値率向上による設備づくりの実践(OS3-3 先進生産システム)
朝立 裕治
著者情報
会議録・要旨集 フリー

詳細
抄録
Now is the situation severe in competition of an enterprise worldwide. I think production system reorganization is necessary for an enterprise to survive. The value by the figure is needed to control quality in a production system. Estimating a production system by the process value-added rate is proposed. The process value-added rate is the percentage of the value-added process in a production system. You can also estimate by the same standard in a different production system. A cost of productive facilities can be reduced by managing the process value-added rate. An example of the effect is mentioned. (1) Reduction in production process. (2) Unit price reduction in production process. I believe this activity to make an enterprise grow.
著者関連情報
© 2009 一般社団法人 日本機械学会
前の記事 次の記事
feedback
Top