抄録
This paper proposes a robust method for capacity requirements planning (CRP) that can generate a stable load plan against dynamic changes in manufacturing environment. The proposed method determines the processing periods of operation orders so as to minimize the probability that the resource requirement of each operation order exceeds the capacity of corresponding resource. In numerical experiments, the load plan generated by the proposed method is compared to those using the conventional method and the effectiveness of the proposed CRP method is demonstrated.