The Proceedings of Manufacturing Systems Division Conference
Online ISSN : 2424-3108
2017
Session ID : 307
Conference information

Effects of Optimal Supervisor on Scheduling Performance of Multi-cluster Tools
*Masaru SakaiTatsushi Nishi
Author information
CONFERENCE PROCEEDINGS FREE ACCESS

Details
Abstract
Multi-cluster tools are widely used for semiconductor manufacturing. Multi-cluster tools can cause a deadlock due to resource conflicts. The deadlock may cause a serious decrease of throughput and a deterioration of quality of product. Therefore, the deadlock prevention method is necessary. In this paper, the optimal supervisor of multi-cluster tools is derived by reachability analysis of Petri nets for deadlock prevention. The effects of the optimal deadlock-free model is evaluated from the viewpoint of the scheduling performance.
Content from these authors
© 2017 The Japan Society of Mechanical Engineers
Previous article Next article
feedback
Top