動力・エネルギー技術の最前線講演論文集 : シンポジウム
Online ISSN : 2424-2950
セッションID: B116
会議情報
B116 高速増殖原型炉もんじゅ1次ナトリウム純化系プラギング計電磁ポンプ停止後再起動による配管合流部の熱過渡荷重による損傷評価(保全管理・補修/材料強度・破壊評価,OS6 保全・設備診断技術)
矢田 浩基月森 和之
著者情報
会議録・要旨集 フリー

詳細
抄録
In case the electromagnetic pump in the primary sodium purification system of Monju trips up, the sodium flow in the system stops. If we restart the system without stopping the main primary sodium circuit system, the mixing piping structure which connects the branch flow from the purification system to the main flow is subjected to thermal transient load because the cold stagnant sodium is pushed out and the hot sodium from main flow follows. The aim of this study is to assess the fatigue damage of the mixing piping structure in the primary sodium purification system of Monju in case its electromagnetic pump trips up and then it is restarted with keeping plant operation. From the analysis results, we found that [1] the fatigue damages were mainly dependent on the temperature difference between the cold sodium at the initial stage and the hot sodium after restart, [2] the fatigue damages were considerably mitigated by preheating and [3] even the severest case allows more than 400 cycles of this events.
著者関連情報
© 2009 一般社団法人 日本機械学会
前の記事 次の記事
feedback
Top