主催: 一般社団法人 日本機械学会
会議名: 第29回交通・物流部門大会
開催日: 2020/11/18 - 2020/11/20
Derailment at a turnout on railway often adversely affects operation. The existing turnout has a guard rail to prevent misguiding, but there is no guard to prevent derailment. In addition, in the large earthquake warning area, derailment guards are installed even in normal sections, but turnout sections are not installed. If it is possible to install a derailment guard in the turnout section, it is effective as an earthquake countermeasure and prevention of derailment during normal times. In this study, the authors investigated the feasibility of derailment guards in the turnout section. As the primary verification, physical verification was performed using a 127 mm gauge turnout.