交通・物流部門大会講演論文集
Online ISSN : 2424-3175
セッションID: SS1-3-2
会議情報

整備新幹線建設現場におけるフラッシュバット溶接部の品質確保手法
*宇野 裕太郎大野 哲男
著者情報
会議録・要旨集 認証あり

詳細
抄録

For many years, gas pressure welding has been used for the primary welding of rails for the high speed trains construction. In response to the recent labor shortage, flash butt welding was fully adopted from the construction of the Hokuriku Shinkansen (between Kanazawa and Tsuruga). We have established methods to address issues that arise due to the hot and humid environment in summer and the cold environment in winter, and to ensure continuous quality.

著者関連情報
© 2024 一般社団法人 日本機械学会
前の記事 次の記事
feedback
Top