Published: December 15, 2004Received: April 12, 2004Available on J-STAGE: June 03, 2009Accepted: April 12, 2004
Advance online publication: -
Revised: -
Correction information
Date of correction: June 03, 2009Reason for correction: -Correction: DTRECEIVEDDetails: Right : 20040412
Date of correction: June 03, 2009Reason for correction: -Correction: TITLEDetails: Wrong : Lecture Right : Current Industrial Applications of Reliability Engineering and Some Subjects to be Solved in the Future
Date of correction: June 03, 2009Reason for correction: -Correction: SUBTITLEDetails: Right : IV: Status of Application of Reliability Engineering in Nuclear Energy Industry
Date of correction: June 03, 2009Reason for correction: -Correction: AUTHORDetails: Right : Shingo ODA1), Ken-ichi SATO1), Shigeo HATTORI1)
Date of correction: June 03, 2009Reason for correction: -Correction: AFFILIATIONDetails: Right :
1) Hitachi Works, Power Systems, Hitachi Ltd.
Date of correction: June 03, 2009Reason for correction: -Correction: KEYWORDDetails: Right : PSA, Probabilistic safety assessment, PRA, Probabilistic risk assessment, Risk-informed, Risk-based, Core damage frequency
Date of correction: June 03, 2009Reason for correction: -Correction: CITATIONDetails: Right : 2) NRC, “Reactor Safety Study: An Assessment of Accident Risks in U. S. Commercial Nuclear Power Plants”, WASH-1400 (1975). 4) NRC, “Reactor Risk Reference Document”, NUREG-1150 (1987). 8) IEEE, “IEEE Guide to the Collection and Presentation of Electrical, Electric, Sensing Component, and Mechanical Equipment Reliability Data for Nuclear Power Generating Stations,” IEEE-std. 500-1984 (1984). 9) R. A. Bani, A. J. Buslik and N. Z Cho, “Probabilistic safety analysis Procedures Guide”, NUREG/CR-2815 (1985). 10) D. Swain and H. E. Guttmann, “Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications”, NUREG/CR-1278, Final Report (1983). 13) IAEA INSAG, “Basic Safety Principles for Nuclear Power Plants 75-INSAG3 Rev. 1 INSAG-12” (1999). 14) NRC, “Proposed Policy Statement on the Use of Probabilistic Risk Assessment Method in Nuclear Regulatory Activities”, SECY 94-218 (1994). 15) NRC, “Final Policy Statement on the Use of Probabilistic Risk Assessment Method in Nuclear Regulatory Activities”, SECY-95-126 (1995). 16) NRC, Regulatory Guide 1.174, “An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions Plant-Specific Change to the Licensing Basis” (1998). 20) ASME, “Risk-Based Inspection Development Guidelines”, CRTD Vol. 20-1, 2 (1992).