プラズマ・核融合学会誌
Print ISSN : 0918-7928
解説
核融合動力プラントの安全性についての考察
小西 哲之
著者情報
ジャーナル フリー

2002 年 78 巻 11 号 p. 1157-1164

詳細
抄録

Based on the fundamental approach for safety of ITER, a possible extension of it to assure the safety of fusion power plant was considered. Although the entire an alysis and licensing preparation are specific for ITER, its methodology which takes full advantage of the inherent features of fusion is expected to be applied to the fundamental logic of fusion power plants. Both energy and radioactive source terms that could be potential hazards are typically operative for a number of days rather than for a year, as in the case of fission. The major differences from the test reactor ITER were identified as the power blanket, coolant loop, and a generator train that will hold high temperature and a considerable amount of tritium. It is anticipated that the tritium inventory and most of the tritium plant would essentially be same as those for ITER, tritium recovery and removal from the blanket loop will dominate the fusion power plant tritium systems. Such a tritium system will actively remove tritium at a daily throughput of the order of plant inventory. This feature suggests that no dedicated off-normal systems are needed to assure the safety of the fusion plant in terms of environmental tritium release.

著者関連情報
© 2002 by The Japan Society of Plasma Science and Nuclear Fusion Research (Japanese)
前の記事 次の記事
feedback
Top