コンゴ民主共和国マタディ橋の主ケーブル調査
松本 毅辰巳 正明荻原 勝也金子 祐太郎
著者情報
ジャーナル フリー

2014 年 21 巻 81 号 p. 81_89-81_99

詳細
抄録

The Matadi Bridge, a suspension bridge in Democratic Republic of Congo, was completed in May 1983 by the Japanese ODA. For the main cables of this bridge, the wrapping paste and the wrapping wire combination against the corrosion was adopted. In Japan, this combination was found out to be inadequate, and a dry air injection system was introduced. Therefore it was feared that the corrosion of this cable might be found. To examine the present condition, the main cables were unwrapped and investigated at the site. Some corrosion was found as expected. This paper reports this inspection.

著者関連情報
© 2014 社団法人 日本鋼構造協会