鋼構造論文集
Online ISSN : 1884-0329
Print ISSN : 1880-9928
ISSN-L : 1880-9928
打込み式高力ボルトを用いたストップホール法による面外ガセット溶接継手の疲労亀裂補修効果
内田 大介森 猛
著者情報
ジャーナル フリー

2004 年 11 巻 44 号 p. 27-34

詳細
抄録

Bolting-Stop-Hole method is one of useful countermeasures against fatigue cracks originating in steel members. If bearing type of high strength bolts are applied instead of usual high strength bolt, stress transmission in the hole can be expected by stress transfer through bolt itself in addition to friction between the base plate and bolt head (nut). This study aims at making clear the fatigue strength of fatigue cracked out-of-plane gusset welded joints repaired by the bolting-stop-hole method using bearing type of high strength bolt. For this purpose, fatigue tests and stress-measuring tests on model specimens have been performed in consideration of plate thickness.

著者関連情報
© 社団法人日本鋼構造協会
前の記事 次の記事
feedback
Top