2016 Volume 13 Issue 2 Pages 91-97
In this report, we describe the machine operation in the first 4 months of the Phase 1 commissioning of SuperKEKB. The beam commissioning is smoothly going on. Vacuum scrubbing, the optics corrections and others are described.