Journal of the Particle Accelerator Society of Japan
Online ISSN : 2436-1488
Print ISSN : 1349-3833
Topics
Upgrade Plan of J-PARC Main Ring
Yoshinori Kurimoto Yoichi Satofor the J-PARC MR Accelerator Group
Author information
JOURNAL FREE ACCESS

2021 Volume 18 Issue 1 Pages 10-20

Details
Abstract

The J-PARC Main Ring has provided high-intensity proton beams for the long-baseline neutrino oscillation experiment called T2K. The present beam power reaches 515 kW. The T2K experiment recently indicated the CP violation in the lepton sector. To increase the confidence level of the indication, we plan the upgrade of the J-PARC Main Ring to achieve a beam power of 1.3 MW. In this article, we describe not only the upgrade for 1.3 MW but also various activities which we have already done to achieve the present beam power.

Content from these authors
© 2021 Particle Accelerator Society of Japan