加速器
Online ISSN : 2436-1488
Print ISSN : 1349-3833
話題
J-PARCニュートリノビームライン超伝導磁石システム
荻津 透 木村 誠宏安島 泰雄荒岡 修藤井 芳昭ニック ヘイスティング東 憲男飯田 真久小林 隆槙田 康博中平 武中本 建志大畠 洋克岡村 崇弘坂下 健佐々木 憲一柴田 政宏鈴木 祥二田中 賢一寺島 昭男都丸 隆行山本 明市川 温子角野 秀一
著者情報
ジャーナル フリー

2010 年 6 巻 4 号 p. 335-345

詳細
抄録

A superconducting magnet system for the J-PARC neutrino beam line had been under construction since 2004. The system consists of 14 doublet cryostats; each contains 2 combined function magnets (SCFM). The SCFM uses two single layer left/right asymmetric coils that produce a dipole field of 2.6 T and quadrupole of 19 T/m. The SCFMs had been developed by 2004, mass-produced since 2005, and completed by summer 2008. The system has been installed since Feb. 2008 till the end of 2008. The commissioning of the system has been carried out in Jan. to Mar. 2009. The paper summarizes the magnet development and system overview including cryogenics. The paper also reports the production, installation and commissioning status.

著者関連情報
© 2010 日本加速器学会
前の記事 次の記事
feedback
Top