加速器
Online ISSN : 2436-1488
Print ISSN : 1349-3833
話題
理研RIBF新入射器RILAC2の建設
渡邉 裕 池沢 英二大西 純一熊谷 桂子込山 美咲藤縄 雅藤巻 正樹眞家 武士山澤 秀行横内 茂渡邉 環渡辺 博
著者情報
ジャーナル フリー

2011 年 7 巻 4 号 p. 285-293

詳細
抄録

As the third injector of the RIKEN Ring Cyclotron (RRC), RILAC2 has been constructed in order to increase the beam intensity of uranium beam at the RIKEN RI beam factory. The RILAC2 consists of a superconducting ECR ion source (SCECRIS) with an operational frequency of 28 GHz and the linac system (RFQ followed by three drift-tube linacs, DTL1, DTL2 and DTL3). The installation of DTL1, DTL2 and DTL3 started in February 2010 next to the AVF injector site. The SCECRIS, after tested in RILAC pre-injector of high voltage terminal, was installed in newly constructed small building outside of Nishina memorial building. The RFQ were installed in the spring 2010 after its operation frequency was slightly changed. The construction of beam lines (LEBT and HEBT) followed it. The construction will soon finish and the beam commissioning with a Xe beam will start at the end of 2010. It is expected that beam intensity of uranium beam will be improved much in the autumn 2011.

著者関連情報
© 2011 日本加速器学会
前の記事 次の記事
feedback
Top