Journal of Construction Management, JSCE
Online ISSN : 1884-8311
ISSN-L : 1884-8311
The Effect of Simultaneous Pavement Repair in Urban Highway Network
Yasuhito SAKAIYuji INOUEKiyoshi KOBAYASHI
Author information
JOURNAL FREE ACCESS

2008 Volume 15 Pages 159-168

Details
Abstract

The repair range must be appropriately decided for effective pavement management. Pavement deterioration depends on its location, therefore it is optimal to repair only deteriorated place (independent repair policy), if life cycle cost is composed of only repair cost. However, sometimes, deteriorated place and not-deteriorated place are simultaneously repaired (simultaneous repair policy), because of traffic delay during repair activities. This paper consider traffic delay cost during pavement repair in life cycle cost, and describe the effect of simultaneous repair policy. As a result of case study implemented to Hanshin Expressway, simultaneous repair policy is optimal when traffic delay occurs, but independent repair policy is optimal when traffic delay does not occur. Simultaneous repair policy decreased 37.5 thousand billion yen per a year of its life cycle cost.

Content from these authors
© by Japan Society of Civil Engineers
Previous article Next article
feedback
Top