A Study on Application of Hibryd Scheduling Model for Construction Project Planning with Large-Scale Earthmoving
Mamoru HARUNAHiroaki TAKEBAYASHISusumu NAMERIKAWA
Author information
JOURNAL FREE ACCESS

1995 Volume 3 Pages 141-150

Details
Abstract
In this study, a new type scheduling model called hybrid scheduling model combining system simulation model for actual construction implementation process under a certain construction planning and mathematical construction planning model for obtaining better solution of planning evaluating result from simulation model operation.
Appling this hybrid scheduling model to construction plannig of large-scale earthmoving project, it is confirmed that this model works well to obtain a desirable and practical construction planning of large-scale eathmoving project.