Abstract
Five affairs tried until now by designbuild projects in MOC direct contol enterprises are introduced. The effect of this projects and the subject in the case of using it was extracted.
The preceding paragraph showed the purpose of this system. Moreover, the factor which the difference in orde time generates in this system was shown.
Then, the example of trial in MOC direct control enterprise was shown, and the subject by the example of thi; system was shown.
From now on, the effect of cost reduction will be due to be grasped. Moreover, guideline creation is due to bi examined.