下水道整備計画における段階的建設に関する一考察
幹線管渠を対象として
酒井 彰
著者情報
ジャーナル フリー

1985 年 21 巻 p. 13-23

詳細
抄録

Adoption of area-wide sewerage system has brought about long-term planning problems such as uncertainty of the planning parameters and increasing investment at the initial stage of the project. Time phased construction becomes a present problem of sewerage planning.
This paper discusses the case that the multiple sewers are adopted as the main sewer system. Multiple sewer system has an advantage of sizing flexibility at the intermediate stage, comparing to the case of full-scale construction at the initial stage.
Optional sizing at the initial stage is examined with the present value of expected total project cost calculated by serial demand patterns and its occurrence probability. Case study reveals the advantage of multiple sewer system and necessary conditions to perform the time-phased construction of main sewer system.

著者関連情報
© 社団法人 土木学会
前の記事 次の記事
feedback
Top