水工学論文集
Online ISSN : 1884-9172
Print ISSN : 0916-7374
ISSN-L : 0916-7374
琵琶湖流域既往最大洪水の復元による淀川水系の治水計画の検討
石河 康久西川 真介中西 宣敬安田 全男井町 建夫田中 洋一定道 成美
著者情報
ジャーナル フリー

2005 年 49 巻 p. 463-468

詳細
抄録
People living at Lake Biwa shoreline areas have suffered from inundation damages from the ancient time, they strongly desire to relieve themselves from these damages. The largest recorded flood in Lake Biwa basin after Meiji Restoration occurred in 1896, but it occurred long time ago so that little hydrological and hydraulic data such as rainfall data, discharge data of the rivers which are basic information for preparing a flood control plan are left. Therefore we can't take this flood into consideration when we make the flood control plan for Lake Biwa basin. Based on the importance of the analysis of the largest recorded flood, we tried to collect as much data as possible about this flood and simulate this flood correctly based on collected data. And we also analyzed the damage by this flood. Due to the results of the analysis, if this flood occurred now, the water level of Lake Biwa would be higher than the present design flood level even if Setagawa Barrage, which was constructed at the outlet of Lake Biwa, were totally opened. On the other hand, the precipitation in the Kizu and Katsura River basins would be not very large, so the present river-related facilities would be enough for the prevention of the flood damage even if Setagawa Barrage were totally opened. But for the Uji River basin, it is clear that further counter measures for this flood must be taken because the discharge in the river would exceed the actual capacity of flow.
著者関連情報
© 社団法人 土木学会
前の記事 次の記事
feedback
Top