The large-scale jetty was constructed as one of the facilities for a new thermal power plant (generating power: 1, 800, 000kw) in Maizuru City, a project of the Kansai Electric Power Co., Inc. In the construction of the jetty, the new quality control method was applied in pilings and the new-type hammer was developed in order to remove stones that made pile-driving difficult. Also, the newmethod was applied for construction of the superstructure.
This paper presents the new quality cont rol method for pilings and the new construction methods that were applied and developed for large-scale jetty construction.