海洋開発論文集
Online ISSN : 1884-8265
Print ISSN : 0912-7348
ISSN-L : 0912-7348
スリットケーソン岸壁における荷役障害対策の研究
新保 修北島 誠治近川 喜代志渡辺 朋洋
著者情報
ジャーナル フリー

2003 年 19 巻 p. 625-630

詳細
抄録

The termination of cargo loading and unloading often occurs in Tsurga harbor in winter. One of these causes is induced to the rolling motion of ship caused in the jet flow from slit caisson, and one of others is the sympathizing motion of the roll of ship in the swell.
The paper shows the countermeasure for termination of cargo loading and unloading.In the study, the reduction of jet flow form theslit caisson is considered. The rolling motion of ship decreased by a part ofslits covered in rigid wall. The cover of the slit of caisson found out the effective method to protect the termination of cargo loading and unloading.

著者関連情報
© 社団法人 土木学会
前の記事 次の記事
feedback
Top