海洋開発論文集
Online ISSN : 1884-8265
Print ISSN : 0912-7348
ISSN-L : 0912-7348
ボスポラス海峡横断鉄道トンネル建設工事の施工支援ツールとしての3次元流動シミュレーション
織田 幸伸伊藤 一教高山 百合子上野 成三栄枝 秀樹
著者情報
ジャーナル フリー

2005 年 21 巻 p. 903-908

詳細
抄録
The immersed tunnel crossing the Bosphorus Strait located in Istanbul, Turkey, is under construction. It is known that the current field of the Bosphorus Strait is complicated. It has two-layer flow of surface southward and bottom northward. In this paper, the numerical hydrodynamic simulation, which is carried out to clarify the current structure, is described. This simulation results are used for construction assistance system.
For the simulation, the salinity and temperature boundary conditions of both northern and southern ends of the strait are vertically given as step function. The simulation results agree with monitoring results well. Through the simulation, following results are found out. Large water level difference between both ends of the strait causes the increase of the current speed of both surface and bottom layers. However, in one range of the water level difference, the maximum current speed of the surface layer reaches a constant value of 1.8 m/s approximately. The current structure is mainly ruled by the shape of the density interface.
著者関連情報
© 社団法人 土木学会
前の記事 次の記事
feedback
Top