Quarterly Report of RTRI
Online ISSN : 1880-1765
Print ISSN : 0033-9008
ISSN-L : 0033-9008
PAPERS
Modeling an Optimal Track Maintenance Schedule in Consideration of Timing of Grinding and Tamping
Mami MATSUMOTOMasashi MIWA
著者情報
研究報告書・技術報告書 フリー

2017 年 58 巻 3 号 p. 229-235

詳細
抄録

Today, tamping machines and rail grinding machines are used to maintain ballasted tracks and to remove rail surface irregularities, respectively. Even though maintenance cycles could be extended and the total cost of maintenance could be reduced by efficiently combining these two machines, they are usually operated independently. As such, in order to estimate the effect of combining both these machines (combined maintenance), a model has been designed along with a scheduling system, as a simple method for preparing maintenance schedules which combine tamping and grinding. Investigations were also carried out to establish how long this type of maintenance lasts, and determine the optimum level of combined maintenance.

著者関連情報
© 2017 by Railway Technical Research Institute
前の記事 次の記事
feedback
Top