2023 年 64 巻 2 号 p. 121-128
When accreted snow drops off train bogies, it can damage railway ground facilities along tracks, train devices, etc. As a countermeasure against such snow accretion damage, we have developed a snow accretion analysis method to understand the snow accretion process. The "snow accretion analysis method" developed in this research consists of an "airflow calculation," a "trajectory calculation" and a "snow accretion calculation." In this research, we performed two kinds of snowfall wind tunnels to validate the proposed simulator.