Abstract
This paper will report the operation flow of "Development of energy conservation system by separating dehumidification in air-conditioning". Six operating patterns are programed by using PLC (Plogramabl Logic Controler). The experimental facility which unitized the whole of the system is instoled in part of own company office, and enrgy consumption will be compared with the existing facilitiy.