Abstract
The DHC system in the block 3 in Nakanoshima was planned to utilize thermal energy of river water. The performance is continuously evaluated after it began to operate in December 2004. This report outlines results of the performance evaluation on annual operation from 2005 to 2007 and of various analyses based on ratingpractice.