日本鉱業会誌
Online ISSN : 2185-6729
Print ISSN : 0369-4194
粗粒段階での脈石分離技術 (その2)
操業例と文献紹介
原田 種臣林 紀夫小棹 理子
著者情報
ジャーナル フリー

1984 年 100 巻 1151 号 p. 1-10

詳細
抄録

In today's mill operation, both rise of the electric power cost and lack of the land for tailing dam are serious problems. “Elimination of the gangue mineral in coarse grain sizes” can be said as an approach which solves positively the problems men-tioned above. Namely, a remarkable decrease in quantity of the gangue mineral passing a grinding circuit based on “Elimination-” brings, 1) a reduction of the electric power cost in grinding circuit, 2) a prolongation of the life of tailing dam owing to lesser formation of the slimy tailing. Moreover, by attainment of the matter mentioned above, a selling of the gangue mineral as aggregates may be expected.
In order to offer some technical informations to various trials concerned with “Elimination ”, in the second paper, this research committee has reported about the following two subjects.
1) Examples of actual operation:
Jokoku Plant (Hokkaido)
Hosokura Plant (Miyagi Pref.)
Kaneuchi Plant (Kyoto Pref.)
Yanahara Plant (Okayama Pref.)
Kuga Plant (Yamaguchi Pref.)
Kushikino Plant (Kagoshima Pref.)
2) Introduction of an important literature:
La Préconcentration (Industrie Minerale-Les Techniques, Janvier 1981)

著者関連情報
© The Mining and Materials Processing Institute of Japan
次の記事
feedback
Top