三井砂川鉱業所における竪坑開装及び捲揚設備
西川 豊大西 重吉郎野村 幸三郎
著者情報
ジャーナル フリー

1953 年 69 巻 784 号 p. 395-403

詳細
抄録

This paper explains the general plan for coal mining by such shafts as main winding shaft (No.1 shaft), main up-cast shaft (No.2 shaft) and:blind shaft for conveying packing materials at Mitsui Sunagawa Coal Mine. The further explanations given here are those about the outline of structure of the main winding shaft, process of its sinking work, and the winding equipment.