1972 年 88 巻 1013 号 p. 388-394
As a result of modernization of mining since 1964, the output was increased, in 1970, to 6, 220 tons a day from 5, 477 tons and overall underground productivity to 19.7 tons per man-shift from 13.2 tons.
The main points of the modernization are as follows: 1. Mining a. Installation of elevator in the underground.b. Speed-up of tunnelling and raising. c. Preparation and extending use of AN-FO. d. Improvement of bits and rods for drilling. e. Increase of mining efficiency. f. Loading by larger equipments. 2. Main haulage a. Use of large-size mine cars. b. Remote control of trains. c. Introduction of automatic traffic signal system.