計測自動制御学会論文集
Online ISSN : 1883-8189
Print ISSN : 0453-4654
ISSN-L : 0453-4654
バッチプラント生産スケジューリングシステム
その実用化への問題点と実プラントによる検証
富田 昭司藤村 茂檜物 亮一
著者情報
ジャーナル フリー

1993 年 29 巻 7 号 p. 843-850

詳細
抄録
We developed a production scheduling system for batch plants. This system supports human intelligent works by using the auto scheduling on the system and the manual modification or the rescheduling cooperatively.
The scheduling system which works well in various situations at factories must have some flexibilities as follows. 1) A scheduling system has a frame to reflect user requests easily. 2) A scheduling system has a function to modify scheduled results to satisfy user's expectation.
They are realized as follows. 1) We add a customize function to incorporate a individual plant's know-hows into the auto scheduling strategy. 2) We develop the flexible user interface to cooperate with user and the function of manual modification.
In this paper, the problems for practical use are summarized and the effects of this system are demonstrated by the field test in a chemical plant.
著者関連情報
© 社団法人 計測自動制御学会
前の記事 次の記事
feedback
Top