Proceedings (National Conferences of The Society of Project Management)
2003.Autumn
Conference information

The revolutionary movements for "Contract management" based on "Risk management" : The revolutionary changes of the basic policy for the procurement concepts in American Department of Defense (DOD)
Kazuya Omori
Author information
CONFERENCE PROCEEDINGS OPEN ACCESS

Pages 282-287

Details
Abstract
MIL-Q-9858 (1964) "Quality assurance requirement" specification had been kept the authorized situations as the roots of the both categories of the Software and the Hardware for the Military procurement products for 40 years long and as the roots of ISO-9000 (1974) "Quality Management" International Standard". However, American DOD (Department Of Defense) made the evolutional changes for their "Contract Management" concepts after canceling MIL-Q-9858 by the new DOD Directive One, which was based on the "Risk management" from the first stage to the last stage of the Military procurements for the weapon system's products. Though it is operated now only in the military versions, it shall be applied in the civic versions after recognizing the excellent effectiveness as the total management in the enterprises. This paper was introduced the general information of the new documents for concerning of the area.
Content from these authors
© 2003 The Society of Project Managemen
Previous article Next article
feedback
Top