Abstract
It is difficult to assign usually the project manager (hereafter PMgr) who has good engineering and management skills corresponding to wide range product developments. The research treats the human resource management (hereafter HRM) in case the project manager who has not lots of experiences will be assigned to the R&D project for the custom made products. It was curried out that the simulation analysis for the project performance, such as cost and schedule management in a project. As the verification results of simulation analysis, the HRM in the small size venture enterprise are proposed.