Abstract
Various Global Integrated Companies has relocated some system operation and work operation into beyond the sea. As a result global virtual teams are required for the operations. To proceed with the operation without failure, the operation should not be relocated directly: operation optimization is required before the relocation. In this paper, hints, risk, problems, and solutions for the optimization are discussed.