構造工学論文集 A
Online ISSN : 1881-820X
維持管理
高速列車通過時における著大輪重発生メカニズムと要因分析および鋼橋の疲労に関する研究
田辺 篤史関 雅樹松浦 章夫
著者情報
キーワード: 維持管理, 鋼橋, 著大輪重, 疲労
ジャーナル フリー

2011 年 57A 巻 p. 780-787

詳細
抄録

Recently it was found that a large wheel load exceeding twice of static one occurred by high speed train passage. This study is aiming to grasp the mechanism of large wheel loads by using measured data obtained by the examination train. Then, the effects of the large wheel load on steel bridges were evaluated by using field measurement data. Statistical method revealed that the frequency of larger wheel load increases by train speed and that the track type has less effect. Two scenarios of large wheel load were found. Rail joints may cause high frequency vibration and it results large wheel load, but it has no effect on steel bridges because it dissipates rapidly. Uplift of sleeper produces large wheel load with low frequency and it could increase stress range at the upper flange of girder bridges by 10-20%.

著者関連情報
© 2011 公益社団法人 土木学会
前の記事 次の記事
feedback
Top