認知的タスク分析を適用した原子力発電所の保守計画不良の要因分析
高川 健一飯田 裕康
著者情報
ジャーナル フリー

2011 年 10 巻 4 号 p. 257-272

詳細
抄録

  Imperfect maintenance planning was frequently identified in domestic nuclear power plants. To prevent such an event, we analyzed causal factors in maintenance planning stages and showed the directionality of countermeasures in this study. There is a pragmatic limit in finding the causal factors from the items based on report descriptions. Therefore, the idea of the systemic accident model, which is used to monitor the performance variability in normal circumstances, is taken as a new concept instead of investigating negative factors. As an actual method for analyzing usual activities, cognitive task analysis (CTA) was applied. Persons who experienced various maintenance activities at one electric power company were interviewed about sources related to decision making during maintenance planning, and then usual factors affecting planning were extracted as performance variability factors. The tendency of domestic events was analyzed using the classification item of those factors, and the directionality of countermeasures was shown. The following are critical for preventing imperfect maintenance planning: the persons in charge should fully understand the situation of the equipment for which they are responsible in the work planning and maintenance evaluation stages, and they should definitely understand, for example, the maintenance bases of that equipment.

著者関連情報
© 2011 一般社団法人 日本原子力学会
前の記事 次の記事
feedback
Top