日本原子力学会和文論文誌
Online ISSN : 2186-2931
Print ISSN : 1347-2879
ISSN-L : 1347-2879
論文
福島第一原子力発電所における事故対応ワークロード分析に基づく緊急時対応力向上に関する研究
吉澤 厚文 大場 恭子北村 正晴
著者情報
ジャーナル フリー

2019 年 18 巻 2 号 p. 55-68

詳細
抄録

 This study aims to improve the potential of an emergency response by analyzing the workload management during the accident at the Emergency Response Center (ERC) of TEPCO’s Fukushima Daiichi Nuclear Power Plant. Specifically, the research focused on the response of the ERC during the time between the discontinuation of Unit 3 core water injection and its recovery. It identified the different types of workload at the ERC had and how they had been managed based on the record of a TV conference. It also deduced the casual factors of the responses, supplementing the interview record of the director of ERC at the time by applying workload management analysis. On the basis of these findings, lessons to enhance the potential of the on-site emergency response have been obtained for ERC and outside organizations.

著者関連情報
© 2019 一般社団法人 日本原子力学会
前の記事 次の記事
feedback
Top