Abstract
In the process of mixture model estimation using Expectation-Maximization (EM) methods, mixture densities are required to be measured at every step to obtain posterior probabilities. When the number of data n in a dataset or the number of mixtures m is large, the time complexity required for the evaluation of posterior probabilities is O(mn).