Transport Policy Studies' Review
Online ISSN : 2433-7366
Print ISSN : 1344-3348

This article has now been updated. Please use the final version.

Debt redemption simulation of expressways
Looking ahead to permanent tolls on expressways
Takao GOTOMasayoshi TANISHITAToshinori NEMOTO
Author information
JOURNAL FREE ACCESS Advance online publication

Article ID: TPSR_24R_02

Details
Abstract

In this study, we performed a debt redemption simulation of Japan’s expressway network when tolls were collected until FY 2115, and then compared it with the current toll levels of expressways, which are based on a model that assumes toll collection until FY 2060. The results showed that if the current framework is maintained, and “Shin-Tomei/Shin-Meishin’s lanes increased to six,” “Provisional two-lane to four-lane project,” and “Renewals” are implemented, the toll will be increased by at least 10%. The results also clarified that the simulation values of debt redemption would be almost the same when considering all electronic tolling and halving of the fare for the provisional two-lane sections. Further, the results of the sensitivity analysis showed that the toll rate could be reduced for “extension of the road improvement period for the provisional two-lane to four-lane project” and the toll rate in the cases of “property tax exemption” and “1% maximum interest rate” can be less than the current one.

Content from these authors
© 2022 Japan Transport and Tourism Research Institute
feedback
Top