MEASURED DEFORMATIONS AND EXPECTED ANALYSIS CAUSED TO THE EXISTING TUNNEL DURING NEARBY CONSTRUCTION OF UPPER AND LOWER PARALLEL SHIELD TUNNELS
Released on J-STAGE: October 20, 2022 |
Volume 78
Issue 4
Pages 261-276
Yawji OKU, Hiroshi DOBASHI, Noriyuki HORICHI, Junichi NAGAYA, Seungik CHANG, Atsushi KOIZUMI