Journal of Architecture and Planning (Transactions of AIJ)
Online ISSN : 1881-8161
Print ISSN : 1340-4210
ISSN-L : 1340-4210
TOTAL SCHEDULE SYSTEM ON PC HOUSING MANUFACTURING : Study on production system of the prefabricated houses using precast concrete panels (Part 4)
Jun SHIINO
Author information
JOURNAL FREE ACCESS

1994 Volume 59 Issue 465 Pages 133-142

Details
Abstract

In this paper, the author clarifies the Total Schedule System for leveling the monthly production volume in a manufacture company which is the case example of CIM for Precast Concrete Housing Manufacturing. Through the implementation of the Total Schedule System which integrates each Department, that is, Marketing and Sales Dept., Design and Proposal Dept., Estimate Dept., Procurement Dept., PC Panel Production Dept., and Construction Dept., it became clear that the monthly construction completion volume is remarkably stabilized.

Content from these authors
© 1994 Architectural Institute of Japan
Previous article Next article
feedback
Top