Journal of Architecture and Planning (Transactions of AIJ)
Online ISSN : 1881-8161
Print ISSN : 1340-4210
ISSN-L : 1340-4210
THE APPLICATION OF CONSTRUCTION PROCESS CHART METHODS TO QUALITY CONTROL : Construction planning and scheduling with construction process chart (Part 5)
Yukio OSAWA
Author information
JOURNAL FREE ACCESS

1999 Volume 64 Issue 519 Pages 217-224

Details
Abstract

The previously reported papers proposed new systematical methods based on "Construction Process Chart" to solve resource levelling and term shortening problems on a construction project. That is to say, proposal methods can express many planning items and their mutual relationships, and have the capability of enabling superviser in the front line to formulate plans efficiently, and regarding many planning items comprehensively. Concerning the application of construction process chart methods, this paper focucing on reinforced concrete works, cleared the characteristics of inspections in construction works, and pointed out essential algorithm of practical quality control procedure. Then, the author adapted the improved methods to the practical structuarig works, which proved they would greatly contribute to the successful usage of quality control planning phase.

Content from these authors
© 1999 Architectural Institute of Japan
Previous article Next article
feedback
Top