INTRODUCTION OF STEEL STRUCTURE ARCHITECTURE IN THE PERIOD OF THE FOUNDATION OF THE JAPANESE GOVERNMENT-CONTROL YAWATA IRON WORKS : No.1 A study on the introduction and development process of steel structure architecture in Japan
Kazuhiko HIRAKIDAKenji ONOMICHI
Author information
JOURNAL FREE ACCESS

2007 Volume 72 Issue 618 Pages 129-134

Details
Abstract
The first building of the Japanese government-controlled Yawata Iron Works, which was first operated in the 34th year of Meiji (1901), was our country's first full-scale steel framed building. In this paper, the organization of institutional construction at the time the government controlled Yawata Iron Works stated operation in the 34th year of Meiji (1901) is made clear. Out of a group of factory buildings constructed at the time of establishment of Yawata Iron Works, I take up the issue of the only Ogura repair factory still existing in its complete form today, completed in the 33rd year of Meiji (1900). I also clarify the relations between a Japanese and a German on the design by that German and environment in which construction took place in those days. Furthermore, I also detail the construction process of factory ever after the 33rd year of Meiji (1900).
Content from these authors
© 2007 Architectural Institute of Japan
Previous article Next article
feedback
Top