2025 Volume 90 Issue 834 Pages 1683-1694
This study analyzes the enforcement status of repair work involving four specific items: exterior wall repair and waterproofing paint application, roof waterproofing construction, rainwater pipe replacement, and ceiling detachment measures, as well as seismic retrofitting of the entire building, based on a questionnaire survey for venues as theaters and concerthalls with capacities exceeding 800 seats. Specifically, using data on daylight hours and the number of earthquakes causing damage, the analysis was conducted by categorizing buildings according to deferred floor space and number of seats. Furthermore, the correlations among these factors were examined.