Abstract
This is the third report of the studies on the planning of hospital buildings through the analysis of the functional relationships of materials supply and distribution system. Firstly, This paper describes the actural conditions of the flows of each material in three hospitals (791 Bed, 275 Bed, 290 Bed), i.e. how much materials are trensported per day, and how often. Secondly, I analyzed the estimated volume of each material that would be transported per 100 Beds and per day in four hospitals (the preceding three hospitals and a fourth one hospital with 403 Bed). As a result, I proposed the "Planning Unit Indicator (Volume of materials distribution per 100 beds per day)" of the cyclical flows of materials in general hospitals.