Journal of Architecture, Planning and Environmental Engineering (Transactions of AIJ)
Online ISSN : 2433-0043
Print ISSN : 0910-8017
ISSN-L : 0910-8017
NECESSARY CONDITION FOR THE CORDINATION ON THE FIRST LAKE BIWA DRAINAGE PROJECT : Study on the process of planning and constructing the First Lake Biwa Drainage Project Part 3
Naofumi ODAShingo TAMAKI
Author information
JOURNAL FREE ACCESS

1993 Volume 451 Pages 177-186

Details
Abstract
This paper analyzes the process how the various views among the interested parties for the First Lake Biwa Drainage Project had been coordinated. The conclusion are as follows, 1) Shiga Prefecture and Osaka Prefecture, or johannis de Rijke and the others concerned stood against this project. 2) Kyoto Prefecture could not coordinate the interested parties, because they had not the know-how of water control, and the environment and economical assessment for the project. 3) However, Meiji Government and Kyoto Prefecture carried out the project into execution, because Meiji Government of the day was eager for the modernization of the State, so that the interested parties were finaly forced to accept this project.
Content from these authors
© 1993 Architectural Institute of Japan
Previous article Next article
feedback
Top