日本建築学会構造系論文集
Online ISSN : 1881-8153
Print ISSN : 1340-4202
ISSN-L : 1340-4202
シールドトンネル直上掘削時の実用的なリバウンド量予測方法の提案
石井 善一藤井 衛岩田 暁洋小林 治男妹尾 博明
著者情報
ジャーナル フリー

2009 年 74 巻 639 号 p. 821-829

詳細
抄録
We proposed a simple method that estimate displacement of shield on excavating above shield and verified this method by two results that were measured under different ground structure and different plan of excavation. We get a few opinions by this verify and refer as follows.1) The shield displacement is predictable in two-dimension elasticity FEM analysis that considers the ground rigidity decrease by the excavation in the direction of the axis line and the decrease by the excavation is from initial rigidity obtained from PS logging. The bottom of decrease area should set as bottom of pressure bulb (σz=0.1p). 2) Value of shield displacement is estimated as that of ground at bottom of the shield.3) The three-dimensional effect of the excavation plan that have the longer side in the direction of the axis line is estimated multiply α (Ratio of analytical result in direction of axis line of digging center and analytical result in direction of crossing) by the analytical result in the direction of the axis line.4) The shield displacement is estimated by decreasing the ground rigidity the area modeled pressure bulb (σz=0.1/p) when the final excavation.
著者関連情報
© 2009 日本建築学会
前の記事 次の記事
feedback
Top