Journal of Structural and Construction Engineering (Transactions of AIJ)
Online ISSN : 1881-8153
Print ISSN : 1340-4202
ISSN-L : 1340-4202
A STUDY ON INFLUENCE THE CONSTRUCTION TIME OF YEAR AFFECTS THE CRACKS OF PLASTERING MORTAR RESTRAINED BY CONCRETE
Takaaki OHKUBOTakashi INOHARAShinya MATSUMOTO
Author information
JOURNAL FREE ACCESS

2012 Volume 77 Issue 673 Pages 333-340

Details
Abstract
The purpose of this research is reducing the cracks produced in the plastering mortar that has contraction restrained by ground concrete about the outer wall and floor component of reinforced concrete buildings. It tried to evaluate the relation between the construction time of plastering mortar and the small crack produced on the mortar surface by this paper. The examination object which finished in the middle of the month every month of one year, and constructed mortar was exposed to the outdoors and indoor using the small concrete with plastering mortar specimens, and the generating situation of a crack was observed. Consequently, it was experimentally shown clearly that small cracks become easy to produce the time when temperature falls in one month after the mortar plastering.
Content from these authors
© 2012 Architectural Institute of Japan
Previous article Next article
feedback
Top