Transactions of the Architectural Institute of Japan
Online ISSN : 2433-0027
Print ISSN : 0387-1185
ISSN-L : 0387-1185
PRODUCTION ANALYSIS OF PRECAST CONCRETE CONSTRUCTIONS : Part 2. Man-hours on production of precast concrete in the stnndard public housing
SHIGERU WAKAYAMAKAZUO GOTOMAKOTO YOSHIOKA
Author information
JOURNAL FREE ACCESS

1974 Volume 225 Pages 1-8,67

Details
Abstract
This is our 2nd report of the production analysis of p.c-construction. The study theory and the detailed method of the production analysis were reported in our former report. The classification of production method in p.c-plant, and man-hours on production of the p.c-component in standard pubric housing system, are featured in this report. Production analysis is to make clear the productivity of some construction systems with scientitic approach. We applied the method used in I.E. (industrial engineering) to construction systems. We conclude from this analysis that the productivity of P.C. l-component depends on its form. And some multiple regression models which combine the form and the productivity are induced in this report.
Content from these authors
© 1974 Architectural Institute of Japan
Previous article Next article
feedback
Top