As one of the effective policies for reducing the quantity of construction waste, it is aimed at works which is reinforced and extended after removing a structurally unnecessary portion from the existing building frames. In this report, after describing the outline of the whole works, the characteristic is clarified by investigating the details of partial demolition of the existing building and analyzing procedures and work rates.